Styku 3D Body Composition Analysis
Our Styku 3D Body Scanner captures precise measurements, body fat percentage, posture, and more. This will show you your transformation in detail. No guesswork. Just data that empowers your health journey.
What Is Styku?
There’s never been a more powerful, precise, and complete presentation of physical assessment data than Styku! A sophisticated 3D infrared scanner measures and provides a detailed analysis in minutes. Determine your fat and lean body mass. Look at your visceral fat and discover your risk for many illnesses based on your analysis. Most importantly, explore how you can reach healthier levels of fitness to improve your health! You’ll see yourself as you really are, and you’ll see your progress as you’ve never seen it before!
Tape measures are notoriously error prone and potentially awkward. Calipers can be uncomfortable and even painful. Styku is a quick and non-invasive platform to get the measurements you need. Simply stand on the Styku turntable—facing forward with arms slightly extended—and hold still for 35 seconds while the platform revolves. Styku captures millions of data points and after the scan is complete, your results are displayed for an accurate 3D representation of you that’s viewable from a variety of perspectives. You can rotate, pan, zoom, and nest silhouettes to see real progress. It’s an honest, objective way to measure yourself as you progress toward your health and fitness goals.
Styku sessions are approximately 20 minutes and include the scan and data evaluation. A detailed Styku report will be emailed to you, so you can take time evaluating all the fascinating information provided. To monitor your progress, your data will remain in the system for comparison with future scans.
You’ll want to make sure you dress simply with a minimal, form-fitting clothing layer to get the most accurate measurements. Options include sports bras, form-fitting tights, leggings, underwear, or form-fitting swimwear. Loose fitting clothing will result in inaccurate measurements. Socks should be light colored or removed. You’ll also need to remove your shoes, hat, watch and large jewelry. Longer hair needs to be pulled into a loose bun – we have hair ties available.
Plan on attending your assessment “dressed to be assessed” by wearing the proper assessment attire under your outerwear.
Sample Report from Styku 3D Body Scanner
This is one page of the comprehensive report demonstrating measurements over time for a woman intent on losing weight. This represents a 66lb weight loss over 7 1/2 months per the data on the scan report.
Monitor Weight Loss, Fat Loss and Lean Muscle Mass Gains Over Time
The Styku 3D Body Scan is ideal for:
- fitness buffs
- those on a weight loss journey
- those who want to assess their risks for diseases like diabetes, cancer and other illnesses based on body composition.
You no longer have to guess or struggle with the tape measure and calipers. With the Styku scanner you can see real progress!
Styku Body Scan Pricing
Establish Your Baseline - 1 Scan for $59
Track Your Progress Over Time - 3 Scans for $149
Emerald Laser Clients – FREE
The Emerald Laser is a whole body FDA-approved laser for fat loss.
Lose fat – not muscle!
*Price includes a digital copy of the full scan results report or progress report (when prior scans have been completed) that are emailed to you, and review with a Styku certified practitioner.